Assembly Instructions House Style 12 x 20 x 8
Rail should fasten under the End Top Crest Arches but
above
middle Top Crest tubes.
ANCHORING FRAME TO GROUND
NOTE: Do not completely tighten bolts that connect the
Cross Rails to the End Arches. They must be removed
for proper for End Panel Zippered Door installation
Step 7. Move the frame assembly into its final
installation location. This should be done with at least
one person lifting each side or corner to avoid bending
or stressing any frame members. Frame must
then be
aligned and squared up in position. Use a straight line
string to align all frame members on the first side into
position. Then measure and adjust each arch end to the
proper base width of 12’ to align the other side. Finally
measure diagonally from inside corner to inside corner of
frame. Both diagonal measurements should match.
Measure at each end across base of arches. Do not
expand arch width beyond 12’ wide. This will severely
reduce strength of arch assembly and cause fabric
misfit.
Adjust frame and support as necessary to bring frame
into square. Failure to square frame of unit will result
in poor main cover fit and reduced strength and
rigidity.
V2.2
Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
4
Step 8. Once frame is square and properly supported,
tighten carriage bolts on all frame members, except for
End Arch members to Cross Rails along base, side, and
top. After hardware is tightened, insert plastic end plugs
EP-1000 (1 5/8”) & EP-1001 (1”) into all open ends of
frame members.
Once frame is square and properly supported, tighten
carriage bolts on all frame members, except
for End
Arch members to Cross Rails along base, side, and top.
Do not over tighten or oval tubing. After hardware is
tightened, insert plastic end plugs #14 (1 5/8”) & #15 (1
1/8”) into all open ends of frame members.
NOTE: Frame must
be anchored before
installing any doors or cover.
Each Rhino Shelter 12x20x8 building comes with 6
EARTH CABLE ANCHORS with U-bolts and nuts.
These versatile anchors allow the frame to be secured to
almost any surface. In addition you have also been
provided with a 36” Drive Rod used to drive the anchor
heads into the earth.
If the location where you are placing the building has
very hard ground or any
rock in it, pre-drill the holes
before inserting anchors. Hammer drills can be rented
at most home improvement or rent-all centers. Hitting
the anchors into rock will cause the drive rod end to
mushroom inside the anchor head, and prevent the drive
rod from coming out of the hole.
Anchor placement should be made inside
the frame at
the interior corners of the unit, and midway along the
sides of the frames. Anchors secure the building to the
ground, as well as prevent spread of the frame over
time.
Align each
Arch with
string to make
edge of Frame
STRAIGHT
before securing
Pre-Drill Holes if there is Any Rock In Ground
Vue de la page 3