Rhino-shelter HOUSE-12W X 20L X 8H Manuel d'utilisateur Page 3

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 9
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 2
Assembly Instructions House Style 12 x 20 x 8
FRAME ASSEMBLY
Step1. Assemble the Front and Rear End Arch
Assemblies. Each will consist of (1) Top Crest (TC-
2000), (2) Bent Tube Side Crest (BTSC-2006) and (2)
End Upright w/Foot (EUL-2002) for each one. Use (4)
CBN-3005-2 carriage bolts with nuts and washers
through pre-drilled holes in frame members.
Be certain to insert carriage bolts from the outer edge
into the interior of the unit, with the washers and nuts on
the inside of the arches. This will avoid tearing the fabric
on doors and main cover when installed. Do not tighten
the nuts completely until the frame is completed and set
in place.
V2.2
Do NOT Return Assembly To Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products Directly
Customer Service 800-447-7079 or 203-877-7070
3
Step 2. Assemble the (2) Corner Wind Braces (CW-
2005) to the End Upright w/Foot (EUL-2002) to the first
of the End Arch assemblies. Use a CBN-3005-3
Carriage Bolt with Washer and Nut to secure the braces
loosely to the Upright. Do not tighten completely.
Step 3. Assemble the Four Interior Arch Assemblies.
Each will consist of (1) TC-2000 Top Crest TuU-2001
Center Straight Upright for each of the arches. Use
CBN-3000-2 carriage bolts with washers and nuts in the
pre-drilled holes, aligned to form the arch.
Step 4. Support an End Arch Assembly with Wind
Braces temporarily in the vertical position. Connect (4)
SCR-2003 Plan End Cross Rails to the End Arch with (4)
CBN-3005-3 carriage bolts, washers, and nuts through
the pre-drilled holes in the arch members. The Cross
Rails should be put into the bottom and side hole of the
arch upright on each side. These will form the Base
Cross Rails and the Side Cross Rails as the arches and
additional cross rails are added. The Base and Side
Cross Rails must all be inside
the arch assembly. Again,
don’t tighten the hardware until the next arch and cross
rails are assembled.
Stand an Interior Arch Assembly up vertically about 48”
from the End Arch Assembly. Align the cross rails holes
with the holes in the interior arch. Using (4) Carriage
Bolts CBN-3000-3 with nuts and washers, connect all
four of the cross rails between the end arch and the first
interior arch assemblies. Connect the (2) Wind Braces
#CW-2005 diagonally across the end and interior arch
as shown in the frame illustration. Caution - The
assembly will not be self-supporting until the Wind
Braces are put into place, so have someone else hold
the assembly up while the bolts are inserted.
SCR-2004 Top
Ridge Rail
Step 5. Begin the Top Ridge Rail by placing the last
SCR-2003 Plain End Cross Rail underneath
the End Top
Crest Tube, but above
the first interior arch crest tube.
Secure the Cross Rail loosely with a Carriage Bolt CBN-
3000-2 with washer and nut facing the interior of the unit.
Step 6. Add remaining 3 middle arches and rear end
arch in the same fashion. Use SCR-2004 Cross Rails
for each connecting base, ridge, and top rails. The
swedged end of the cross rails should be inserted into
the prior end rail at all arches. Note that the Ridge Crest
EUL-2002
End Upright w/Foot
TC-2000 Top
Crest Tube
BTSC-2006
Bent Tube Side
Crest
CW-2005 Corner
Wind Brace
SCR-2003 Side
Cross Rail –
Plain End
CSU-2001
Center
Straight
Uprights
Vue de la page 2
1 2 3 4 5 6 7 8 9

Commentaires sur ces manuels

Pas de commentaire